top of page

01621 857682

Hatton GARDEN

PHOTO-2021-12-16-12-36-08-1.jpg
PHOTO-2022-03-09-10-59-29.jpg
PHOTO-2021-12-15-14-14-01-1.jpg

Description:

 

The works were carried out whilst the building was fully operational. The scope of works included the installation of a steel frame copper clad on the 6th floor of the building, creating an observation area looking out over the city of London. The lift shaft was extended by 2 floors to give access to the observation room.

Southwark GALLERY

  • White Facebook Icon
  • White Instagram Icon
  • Twitter - White Circle

g3 construction

UK Limited

Unit 7A, West Station Yard, Spital Road, Maldon, Essex, 

CM9 6TR.

Tel: 01621 857 682

Opening Hours: 8am - 4pm

Monday - Friday

© 2020 by G3 Construction UK Limited

bottom of page